The I-10 Electric Corridor will consist of multiple facilities, called TeraWatt Charging Centers, that will be spread across California, Arizona, and New Mexico. TeraWatt Charging Centers will be purpose-built to serve heavy-duty and medium-duty electric fleets, featuring dozens of direct current (DC) fast chargers, pull-through charging stalls, on-site driver amenities, and reliable operations including resiliency generation and zero carbon electricity options. TeraWatt will offer access to these sites both for the purposes of long-haul and local electric trucking operations.
SAN FRANCISCO, CA – October 20, 2022 – TeraWatt Infrastructure, a company powering electrified fleets with the most reliable network of charging centers, today announced it is developing the first network of high-powered charging centers for heavy-duty and medium-duty electric trucks along the Interstate 10 (I-10) highway, stretching from the Port of Long Beach – Los Angeles, California to the El Paso, Texas area. By investing in the necessary charging infrastructure, TeraWatt is enabling and accelerating the transition to zero-emission long-haul freight.
Comments are closed.